+91 8697377923 info@prayuktigroup.com
  • Employee Email
  • PMS
Prayukti International
  • WHO WE ARE
    • About Prayukti
      • Overview
      • Our Team
      • Our Clients
      • History
    • Contact Us
    • Group of Companies
  • WHAT WE DO
    • Our Services
      • Advisory
      • Air, Water, Noise Monitoring
      • Climate Change & Sustainability
      • CSR
      • Due Diligence
      • Environmental Impact Assessment
      • Environmental Pollution Control Systems
      • Flood Water Management
      • GIS Services
      • Occupational Health
      • Public Health
      • Social & Livelihood
      • Technical Safety & Risk Assessments
      • Additional- Manpower
    • Our Sector
      • Transport Infrastructure
      • Wash (Water, Sanitation & Hygene)
      • Building & Area Development
      • Metallurgical Industry
      • Mining
      • Renewable
      • Sustainable Development
  • OUR RESEARCH
    • R&D
    • Publications
  • OUR TRAINING
    • Academy of Water Technology and Environment Management
  • CAREERS
  • NEWS & EVENTS
Select Page

Bongs Prayukti International Pvt. Ltd. has been entrusted with obtaining Environmental Clearance for the Proposed Town Development Scheme in Layer-II of Nava Raipur Atal Nagar by NRANVP. The 436.02-hectare Transit-Oriented Development (TOD) project will support sustainable urban growth through the development of essential infrastructure, civic amenities, and mixed-use urban spaces.

by prayukti | Jun 10, 2026 | Uncategorized | 0 comments

Environmental Impact Assessment for the proposed four-lane road and major bridge over the Bhagirathi River connecting Kalna and Gobindapur in West Bengal.

Submit a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Category

  • Events
  • News
  • Uncategorized

Recent Posts

  • Bongs prayukti international pvt. lts. is engaged to prepare the Environmental Impact Assessment (EIA) Report for Environmental Clearance and Tree Felling Application for the proposed four-lane road project comprising a Major Bridge over River Bhagirathi along with viaducts, ROBs, interchanges, grade separators, and other allied structures connecting Kalna of STKK Road and Gobindapur of NH-12 (Old NH-34) in the districts of Purba Bardhaman and Nadia, West Bengal, being developed by the Public Works Department (PWD), Government of West Bengal.
  • Bongs Prayukti International Pvt. Ltd. has been entrusted with obtaining Environmental Clearance for the Proposed Town Development Scheme in Layer-II of Nava Raipur Atal Nagar by NRANVP. The 436.02-hectare Transit-Oriented Development (TOD) project will support sustainable urban growth through the development of essential infrastructure, civic amenities, and mixed-use urban spaces.
  • We are pleased to share that ๐๐จ๐ง๐ ๐ฌ ๐๐ซ๐š๐ฒ๐ฎ๐ค๐ญ๐ข ๐ˆ๐ง๐ญ๐ž๐ซ๐ง๐š๐ญ๐ข๐จ๐ง๐š๐ฅ ๐๐ฏ๐ญ. ๐‹๐ญ๐. (BPIPL) is currently engaged in conducting an ๐™€๐™ฃ๐™ซ๐™ž๐™ง๐™ค๐™ฃ๐™ข๐™š๐™ฃ๐™ฉ๐™–๐™ก ๐™„๐™ข๐™ฅ๐™–๐™˜๐™ฉ ๐˜ผ๐™จ๐™จ๐™š๐™จ๐™จ๐™ข๐™š๐™ฃ๐™ฉ (๐™€๐™„๐˜ผ) study for the proposed offshore drilling activity at Bunduq Oil Field project. The assignment encompasses comprehensive environmental baseline review and reporting. As part of the study, air dispersion modelling (๐ฎ๐ฌ๐ข๐ง๐  ๐€๐„๐‘๐Œ๐Ž๐ƒ) and effluent discharge modelling (๐˜‚๐˜€๐—ถ๐—ป๐—ด ๐—–๐—ข๐—ฅ๐— ๐—œ๐—ซ) are being undertaken to evaluate potential environmental impacts and support effective mitigation planning. The scope also includes development of sustainable waste management strategies aligned with applicable environmental regulations and industry best practices. Through this engagement, BPIPL continues its commitment towards delivering scientifically robust and sustainable environmental solutions for the oil and gas (O&G) sector.
  • Bongs Prayukti International Pvt. Ltd.ย participated in the Two-Day Technical Workshop on Component 1 โ€“ Maturation Phaseย under the CITIIS 2.0 (City Investments to Innovate, Integrate and Sustain 2.0)ย program, held on 28โ€“29 January 2026ย at Silver Oak Hall, India Habitat Centre, New Delhi.
  • We are pleased to announce the signing of the contract for undertaking the Environmental and Social Impact Assessment (ESIA) Study and providing regulatory support to Smart City Thiruvananthapuram Limited for the upgrade of existing waste management facilities.

Recent Comments

  1. prayukti on Prayukti was engaged for Health Safety Environmental Impact Assesment
  2. Working at Walmart on Prayukti was engaged for Health Safety Environmental Impact Assesment
  3. Sujoy Ray on Success Story of a Peri-Urban Community Affected By Unscientific Urban Development In West Bengal

We Bring Opportunities for Newer Greater Sustainable Solutionsโ€ฆ..

Make An Appontment
๎‚

+91 86973 77923

๎€

info@prayuktigroup.com

๎€

View All Locations

Our Sectors
Our Services
About Us
News
Follow Us
  • Follow
  • Follow