Bongs prayukti international pvt. lts. is engaged to prepare the Environmental Impact Assessment (EIA) Report for Environmental Clearance and Tree Felling Application for the proposed four-lane road project comprising a Major Bridge over River Bhagirathi along with viaducts, ROBs, interchanges, grade separators, and other allied structures connecting Kalna of STKK Road and Gobindapur of NH-12 (Old NH-34) in the districts of Purba Bardhaman and Nadia, West Bengal, being developed by the Public Works Department (PWD), Government of West Bengal.

Bongs prayukti international pvt. lts. is engaged to prepare the Environmental Impact Assessment (EIA) Report for Environmental Clearance and Tree Felling Application for the proposed four-lane road project comprising a Major Bridge over River Bhagirathi along with viaducts, ROBs, interchanges, grade separators, and other allied structures connecting Kalna of STKK Road and Gobindapur of NH-12 (Old NH-34) in the districts of Purba Bardhaman and Nadia, West Bengal, being developed by the Public Works Department (PWD), Government of West Bengal.

We are pleased to share that 𝐁𝐨𝐧𝐠𝐬 𝐏𝐫𝐚𝐲𝐮𝐤𝐭𝐢 𝐈𝐧𝐭𝐞𝐫𝐧𝐚𝐭𝐢𝐨𝐧𝐚𝐥 𝐏𝐯𝐭. 𝐋𝐭𝐝. (BPIPL) is currently engaged in conducting an 𝙀𝙣𝙫𝙞𝙧𝙤𝙣𝙢𝙚𝙣𝙩𝙖𝙡 𝙄𝙢𝙥𝙖𝙘𝙩 𝘼𝙨𝙨𝙚𝙨𝙨𝙢𝙚𝙣𝙩 (𝙀𝙄𝘼) study for the proposed offshore drilling activity at Bunduq Oil Field project. The assignment encompasses comprehensive environmental baseline review and reporting. As part of the study, air dispersion modelling (𝐮𝐬𝐢𝐧𝐠 𝐀𝐄𝐑𝐌𝐎𝐃) and effluent discharge modelling (𝘂𝘀𝗶𝗻𝗴 𝗖𝗢𝗥𝗠𝗜𝗫) are being undertaken to evaluate potential environmental impacts and support effective mitigation planning. The scope also includes development of sustainable waste management strategies aligned with applicable environmental regulations and industry best practices. Through this engagement, BPIPL continues its commitment towards delivering scientifically robust and sustainable environmental solutions for the oil and gas (O&G) sector.

We are pleased to share that 𝐁𝐨𝐧𝐠𝐬 𝐏𝐫𝐚𝐲𝐮𝐤𝐭𝐢 𝐈𝐧𝐭𝐞𝐫𝐧𝐚𝐭𝐢𝐨𝐧𝐚𝐥 𝐏𝐯𝐭. 𝐋𝐭𝐝. (BPIPL) is currently engaged in conducting an 𝙀𝙣𝙫𝙞𝙧𝙤𝙣𝙢𝙚𝙣𝙩𝙖𝙡 𝙄𝙢𝙥𝙖𝙘𝙩 𝘼𝙨𝙨𝙚𝙨𝙨𝙢𝙚𝙣𝙩 (𝙀𝙄𝘼) study for the proposed offshore drilling activity at Bunduq Oil Field project. The assignment encompasses comprehensive environmental baseline review and reporting. As part of the study, air dispersion modelling (𝐮𝐬𝐢𝐧𝐠 𝐀𝐄𝐑𝐌𝐎𝐃) and effluent discharge modelling (𝘂𝘀𝗶𝗻𝗴 𝗖𝗢𝗥𝗠𝗜𝗫) are being undertaken to evaluate potential environmental impacts and support effective mitigation planning. The scope also includes development of sustainable waste management strategies aligned with applicable environmental regulations and industry best practices. Through this engagement, BPIPL continues its commitment towards delivering scientifically robust and sustainable environmental solutions for the oil and gas (O&G) sector.

Bongs Prayukti International Pvt. Ltd. participated in the Two-Day Technical Workshop on Component 1 – Maturation Phase under the CITIIS 2.0 (City Investments to Innovate, Integrate and Sustain 2.0) program, held on 28–29 January 2026 at Silver Oak Hall, India Habitat Centre, New Delhi.

Bongs Prayukti International Pvt. Ltd. participated in the Two-Day Technical Workshop on Component 1 – Maturation Phase under the CITIIS 2.0 (City Investments to Innovate, Integrate and Sustain 2.0) program, held on 28–29 January 2026 at Silver Oak Hall, India Habitat Centre, New Delhi.

The workshop was conducted to strengthen the technical, institutional, environmental, and social readiness of the selected cities under the Maturation Phase of CITIIS 2.0, with a focused emphasis on sustainable and climate-resilient Solid Waste Management...